The first phase of this project entailed the installation of new exterior drainage work , the pointing of brickwork and new wooden gutters.
- Services
- Joinery
- Published
- May 2017
The project
The exterior soil stack required relocation due to the proposed installation of new wooden doors.
The underground pipework also needed to be relocated to accomodate the new layout of the proposed new kitchen.
This project involves numerous alterations to the building before we can begin the final steps of fitting the fabulous kitchen.