Lucy’s new bathroom

Really loved the finished look of this project. The bathroom was stripped out and new pipe work laid.

Services
Published
May 2013
Quadrant shower cubicle from B&Q

The project

A new storage area was built, cables laid for new down lights plus extractor fan before the room was re boarded. The room was then fully plastered out. The room was tiled around the shower and toilet area and the new curved shower unit installed. Solid oak wood flooring was laid and new skirting boards fitted. The new sink unit with chrome tap and feature mirror were fitted and chrome radiator plumbed in before the room had its final finish colour.