Levelling an old floor

This is an on going project for the next twelve weeks.

Services
Published
March 2016
Old boards removed

The project

This part of the job involves the removal of the old flooring which is badly fitted, out of level and has numerous dips.

The joists were strengthend with new timber and leveled, new tongue and groove boards were laid to create a sound sub floor which will give a great base for the new hardwood flooring.