Work on the inside of the property is moving along great. Ceilings have been taken down and a new stud wall put in place ready for the removal of the original wall. The steel will be ordered when we get final confirmation from building control on the structural calculations. Work on the kitchen has started with the removal of the block wall separating the dining area and the kitchen,this will create a much larger kitchen. New upvc French doors, kitchen window and velux windows have been ordered ready for the next phase of the project.