Continue Reading

Property refurb on Spring bank Hull

This new project is for a full refurbishment on a second floor apartment in this lovely three storey house on Spring Bank, Hull. All rooms are to be re-plastered with some requiring  walls and ceilings to be stripped back and re-boarding. A full electrical re-wire is to be completed to bring this build up to modern specifications. New kitchen and  bathrooms are to be installed with a modern contemporary look.  

Continue Reading

BATHROOM INSTALLATION ANLABY

This project was to convert a shower room into a new bathroom complete with thermostatic shower bath. After the old bathroom was removed, the walls and ceilings were then clad with  shower panels which created a more up to date modern look. New toilet, basin and chrome towel radiator were also fitted, along with a grey slate effect LVT flooring completing the look of this new room.      

Continue Reading

New wooden fascia’s and finials

This project was to replace and/or repair the old wooden fascia’s on this property. We had to make a number of new fascia’s and finials due the bad state of repair. New lead flashing was installed  throughout  to keep things watertight and creates a decorative feature. The woodwork was then sanded, undercoated and a finish top coat applied.

Continue Reading

Staircase installation

New staircase installation. This project was to take out the old staircase and install a more contemporary design. The staircase was stained as per the clients request and  LED lighting installed to create an amazing feature with the glass panels.    

Continue Reading

Rental Property refurbishment.

The transformation on this property was unbelievable. The original downstairs bathroom was removed and a much larger kitchen installed. A  room was built to accommodate the new bathroom with a much better layout. Due to the new configuration we even had enough room to create a  separate utility area. The full property was re-wired , had a new gas boiler installed then  re-boarded and skim plastered. The new bathroom was fully tiled and a new  suite was installed complete with a thermostatic shower. LVT flooring was installed throughout the downstairs and carpets on the stairs and upstairs bedrooms, the property is now ready to be re-let by the landlord.

Continue Reading

Property refurb project in East Yorkshire

This is another long term project with a property that was far from habitable. New floor joists had to be installed to the downstairs of the property which we insulated before the tongue and grooved moisture resistant chipboard flooring installed. Due to the dilapidated state of the walls and ceilings, the plaster was removed and re-boarded. The property also had a full rewire with up to date consumer unit installed.