Rental Property refurbishment.

The transformation on this property was unbelievable. The original downstairs bathroom was removed and a much larger kitchen installed. A  room was built to accommodate the new bathroom with a much better layout. Due to the new configuration we even had enough room to create a  separate utility area. The full property was re-wired , had a new gas boiler installed then  re-boarded and skim plastered. The new bathroom was fully tiled and a new  suite was installed complete with a thermostatic shower. LVT flooring was installed throughout the downstairs and carpets on the stairs and upstairs bedrooms, the property is now ready to be re-let by the landlord.

Continue Reading

Property refurb project in East Yorkshire

This is another long term project with a property that was far from habitable. New floor joists had to be installed to the downstairs of the property which we insulated before the tongue and grooved moisture resistant chipboard flooring installed. Due to the dilapidated state of the walls and ceilings, the plaster was removed and re-boarded. The property also had a full rewire with up to date consumer unit installed.  

Continue Reading

Dope burger Doncaster

We were  happy to be asked to complete the shop fitting work on the new Dope burger shop in Doncaster. Our first job was to strip out the old fixtures and fittings, the basement walls and ceilings were removed and new metal studwork installed complete with new hygienic cladding.

Continue Reading

Decking project with wheelchair accessible ramp

This project was to lay some wheelchair accessible decking into a garden area. We installed a concrete ramp ( not shown ) from the side of the property to create easy access for use of the wheelchair. The decking was then installed with a small ramp into the French doors. Arbcreative donated our time free of charge to complete this work.