Summer house build

Our latest large build project is this annex summer house. It has been hard going and took nearly a year to get through planning. We are now up to the roof trusses and should have the tiles on shortly.

Continue Reading

Property renovation in Hull

This was an amazing transformation of this second floor apartment. The all property was boarded and skimmed. A new bathroom was installed complete with toilet basin and bath along with a new separate shower room complete with toilet, basin and electric shower. A modern Wren kitchen was installed all ready for the new tenants.  

Continue Reading

Property refurb on Spring bank Hull

This new project is for a full refurbishment on a second floor apartment in this lovely three storey house on Spring Bank, Hull. All rooms are to be re-plastered with some requiring  walls and ceilings to be stripped back and re-boarding. A full electrical re-wire is to be completed to bring this build up to modern specifications. New kitchen and  bathrooms are to be installed with a modern contemporary look.  

Continue Reading

BATHROOM INSTALLATION ANLABY

This project was to convert a shower room into a new bathroom complete with thermostatic shower bath. After the old bathroom was removed, the walls and ceilings were then clad with  shower panels which created a more up to date modern look. New toilet, basin and chrome towel radiator were also fitted, along with a grey slate effect LVT flooring completing the look of this new room.