Rendered single storey extension progress

  Its been a tough year with the Covid pandemic. Progress on our projects has been a lot slower due to lockdowns and we’ve also encountered supply issues with materials. We have also had to postpone planned internal works on a number of our projects too. This single storey extension should start to move along now, this week we are looking at getting the steels installed so we crack on and  finish the external brickwork.

Continue Reading

Brick built wall with metal railings and gate.

This was the final finishing touches to the rendering project we had undertaken. Covid caused this project to take longer then we had anticipated  due to supply issues of stone and metal work but we think the end result looks amazing. The old wall was removed and a new  rustic brick wall was built in its place complete with steel railing and matching gate. Slate capping stones were installed to match the newly laid  slate  to the front of the property. Decorative tile were also laid in the doorway to the property to break up the black slate.