The transformation on this property was unbelievable. The original downstairs bathroom was removed and a much larger kitchen installed. A room was built to accommodate the new bathroom with a much better layout. Due to the new configuration we even had enough room to create a separate utility area. The full property was re-wired , had a new gas boiler installed then re-boarded and skim plastered. The new bathroom was fully tiled and a new suite was installed complete with a thermostatic shower. LVT flooring was installed throughout the downstairs and carpets on the stairs and upstairs bedrooms, the property is now ready to be re-let by the landlord.