Property refurb project in East Yorkshire
- Living room floor
- View of chimney
- Installing joists
- Underfloor heating install
- New tiled floor
- New tiled floor
This is another long term project with a property that was far from habitable.
New floor joists had to be installed to the downstairs of the property which we insulated before the tongue and grooved moisture resistant chipboard flooring installed.
Due to the dilapidated state of the walls and ceilings, the plaster was removed and re-boarded.
The property also had a full rewire with up to date consumer unit installed.