Due to the bad weather and a burst water pipe the office needed a revamp!
We were commissioned to totally rebuild the office area at millerships Engineering after the mains water pipe was frozen due to the bad weather, burst, and caused lots of damage.
The old office had to be completely gutted and all walls and ceilings removed before we began the task of the re-build. A new staff canteen was built with kitchen area and the room was completed with a separate toilet room with washing facilities.
After the staff area was completed, we turned our attention to the main office area. The room was re-boarded and then plastered before we set about decorating the full room. New fire doors and upvc windows were installed before the room was finished off with all new furniture.